Ihr Browser ist veraltet. Bitte aktualiseren Sie auf Edge, Chrome, Firefox.

Energy, Logistics and Administration Building, Davos

The energy supply on the Medicine Campus Davos is becoming sustainable. With the construction of the new energy, logistics and administration building, logistics areas and offices for the administration are being reorganised in addition to the new woodchip heating system. OOS is thus realising a further component of the master plan.

The Medicine Campus Davos is being restructured on the basis of the OOS masterplan. As part of this, the outdated and no longer legally compliant energy supply for current and future uses will be replaced by a wood chip heating system. At the same time, organisational optimisations and additional space are required. The new building solves these different requirements.

The demolition of the old building, which can no longer be used, will clean up the site structure. The designed replacement building blends into the surroundings and, together with the existing building, characterises the appearance of the site.

Maximum freedom for future development steps on the campus.

The forecourt of the extension with delivery areas and access roads is kept compact and enables daily deliveries throughout the year, especially during heavy snowfall.

The construction work is particularly complex and places special demands on logistics and safety. The new building is being constructed in an area that serves as a central distribution hub for heat and energy for the entire site. In order not to disrupt this supply, the distribution was moved to the strategically correct location before the demolition.

Project Details

Client
Kühne Real Estate AG
Location
Davos
Internal Team
Jan Gloeckner, Andreas Derrer, Amine Mikou, Armin Zurfluh, Mikel Martinez Mugica
External Team
Ralbau AG (construction management\total contractor), Afry AG (civil engineer), Anex Ingenieure AG (HVACSE, building physics, building acoustics), Biqs (fire protection)
Year
2025
Typology
Status