In recent weeks, several work steps have been carried out on the historic building and on the new floor.

Work on the extension is almost complete. The roof has been fully repaired using the original tiles.

At the same time, work on the interior is progressing. The fill as a substrate for the future flooring has been installed.

The existing walls were in a worse condition than expected. These have also been repaired and now provide a clean base for the upcoming plastering work.

The listed paving slabs, which were carefully covered during the construction period, have been uncovered again.