Ihr Browser ist veraltet. Bitte aktualiseren Sie auf Edge, Chrome, Firefox.
11.07.22
Final Phase of the New HGK building

The two-year construction work for the new gastronomy and therapy building of the Hochgebirgsklinik Davos is slowly drawing to a close: on the upper floor, the finishing touches are made to the foyer. In the western part of the building, the same for the small gymnasium and in the eastern part of the building for the kitchen and the free-flow area with buffet. The dining and cafeteria facilities as well as the training rooms offer a view of the valley and Lake Davos. The access road will soon be ready for the first visitors. At the same time, the roof is prepared for greening and modelled with the substrate.


More about the project


More about Hochgebirgsklinik Davos