Ihr Browser ist veraltet. Bitte aktualiseren Sie auf Edge, Chrome, Firefox.
05.11.24
Roof Structure at ‘House Uto’

Our ‘House Uto’ project is in an exciting construction phase:

 

  • To enable work on the new roof structure, a temporary roof has been erected to protect the listed parts of the building.
  • On the fourth floor, the various layers are being made visible by the structural interventions. This exposure impressively illustrates the historical substance of the building.
  • On the roof, the ceiling construction for the wooden extension is being assembled in several stages.

 

Next, the other wooden construction elements will be erected and the new windows installed. This will make the structure winter-proof so that work on the interior can continue.

 

More about the project